Inicio > Ciencias de la tierra, geografía, medioambiente, planificación > Ciencias de la tierra/geociencias > Implementazione della costruzione snella con il sistema Last Planner in Iraq
Implementazione della costruzione snella con il sistema Last Planner in Iraq

Implementazione della costruzione snella con il sistema Last Planner in Iraq

Twana Amin

80,88 €
IVA incluido
Disponible
Editorial:
KS OmniScriptum Publishing
Año de edición:
2024
Materia
Ciencias de la tierra/geociencias
ISBN:
9786208049010
80,88 €
IVA incluido
Disponible

Selecciona una librería:

  • Librería Samer Atenea
  • Kálamo Books
  • Librería Elías (Asturias)
  • Librería Kolima (Madrid)
  • Librería Proteo (Málaga)

Un’importante iniziativa di miglioramento, con impatti pratici diretti, è stata l’adozione della Lean Construction (LC). La tecnica LC più conosciuta è il Last Planner System (LPS), che si è dimostrato uno strumento molto utile per la gestione del processo di costruzione e per il monitoraggio continuo dell’efficienza della pianificazione.Al giorno d’oggi, nell’Iraq settentrionale l’aumento della crescita economica e l’urbanizzazione delle città in via di sviluppo hanno portato a estese attività di costruzione che generano grandi quantità di rifiuti. I rifiuti nei progetti edilizi hanno comportato enormi perdite finanziarie per i costruttori e gli appaltatori. Inoltre, possono causare effetti significativi sull’estetica, sulla salute e sull’ambiente in generale.

Artículos relacionados

  • Polarimetric SAR Techniques and Applications
    Carlos López-Martínez / Juan Manuel Lopez-Sanchez
    An increasing number of spaceborne Synthetic Aperture Radar (SAR) systems have been equipped with polarimetric capabilities: ALOS and ALOS-2, Radarsat-2, TerraSAR-X, Envisat-ASAR, Sentinel-1a/b, etc. Future mission will still present this type of diversity: RCM, SAOCOM, Cosmo-Skymed 2nd generation or PAZ. Polarimetry allows sensitivity to the structural and geometric properties...
    Disponible

    66,87 €

  • Innovative Strategies and Frameworks in Climate Change Adaptation
    Alexander G. Flor / Alexander GFlor / Benjamina Gonzalez Flor
    The changes the earth is currently undertaking has been at the forefront of scientific discourse in recent years. Humans as a species have needed to react to these changes and shift their behavior accordingly. Innovative Strategies and Frameworks in Climate Change Adaptation: Emerging Research and Opportunities is a critical scholarly resource that examines the relationship bet...
  • Air Quality Monitoring and Forecasting
    Air quality is personal. Its management is highly so. Asthmatic or air-pollutant-sensitive individuals depend on accurate air quality forecasts to help manage their daily activities.  However, the adverse effects of poor air quality on public health and visibility extend far beyond the daily time horizon. Pneumonic and cardiac vascular responses of individuals in all age groups...
    Disponible

    66,79 €

  • Application of Artificial Neural Networks in Geoinformatics
    Saro Lee
    Recently, a need has arisen for prediction techniques that can address a variety of problems by combining methods from the rapidly developing field of machine learning with geoinformation technologies such as GIS, remote sensing, and GPS. As a result, over the last few decades, one particular machine learning technology, known as artificial neural networks, has been successfull...
    Disponible

    66,75 €

  • Coastal Sea Levels, Impacts and Adaptation
    Extreme sea levels can lead to hazardous events, such as coastal flooding, erosion, or salt water intrusion, with-wide ranging environmental, societal, and economic consequences. In combination with climate-driven sea-level rise, and, potentially, additional changes in storminess, dynamic wave contributions, and tidal dynamics, the adverse consequences of extreme oceanographic ...
    Disponible

    84,51 €

  • Application of Plant Biotechnology in Forestry
    The aim of this reprint is to immerse the reader in the latest biotechnological approaches employed in forestry. From rejuvenation through clonal propagation to somatic embryogenesis, the cryopreservation of germplasm, and the use of molecular techniques and genetic engineering, we aim to unravel the potential and promise of these cutting-edge technologies. In this reprint, lea...

Otros libros del autor

  • Implementierung von Lean Construction unter Verwendung des Last Planner Systems im Irak
    Twana Amin
    Eine wichtige Verbesserungsinitiative mit direkten praktischen Auswirkungen ist die Einführung von Lean Construction (LC). Die bekannteste LC-Technik ist das Last Planner System (LPS), das sich als sehr nützliches Werkzeug für das Management des Bauprozesses und die kontinuierliche Überwachung der Planungseffizienz erwiesen hat.Heutzutage hat das zunehmende Wirtschaftswachstum ...
    Disponible

    80,88 €

  • Mise en œuvre de la construction allégée à l’aide du système du dernier planificateur en Irak
    Twana Amin
    L’adoption de la construction allégée (CA) est une initiative d’amélioration importante qui a des répercussions pratiques directes. La technique LC la plus connue est le système du dernier planificateur (LPS), qui s’est avéré être un outil très utile pour la gestion du processus de construction et le contrôle continu de l’efficacité de la planification.Aujourd’hui, dans le nord...
    Disponible

    80,88 €

  • Implementação do Lean Construction utilizando o sistema Last Planner no Iraque
    Twana Amin
    Uma importante iniciativa de melhoria, com impactos práticos diretos, tem sido a adoção do Lean Construction (LC). A técnica de LC mais conhecida é o Last Planner System (LPS), que tem sido demonstrado como uma ferramenta muito útil para a gestão do processo de construção e para a monitorização contínua da eficiência do planeamento. Atualmente, no Norte do Iraque, o aumento do ...
    Disponible

    80,88 €